|
The
governor is received. The work scope is
identified. A work order package is made up
according to manual requirements and details are
entered into our computer system. The work order is
issued.
The governor is taken
apart. Nuts, bolts, screws, and gaskets are
replaced. Once cleaned, the parts are inspected.
Coatings are then striped and the repair on the
governor begins.

Parts are Liquid
Penetrant Inspected (LPI)
or Magnetic Particle Inspected (MPI)
as necessary.
After inspection parts
are plated and/or painted as required.


After the governor has been assembled, it is put on
the test
bench and tested to ensure that it will
work as required.

After the governor
passes recertification requirements, it is packed,
and returned to the customer with the maintenance
release.
back to top
|